Stochastic Project Networks: Temporal Analysis, Scheduling and Cost Minimization
β Scribed by Prof. Dr. Klaus Neumann (auth.)
- Publisher
- Springer-Verlag Berlin Heidelberg
- Year
- 1990
- Tongue
- English
- Leaves
- 249
- Series
- Lecture Notes in Economics and Mathematical Systems 344
- Edition
- 1
- Category
- Library
No coin nor oath required. For personal study only.
β¦ Synopsis
Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.
β¦ Table of Contents
Front Matter....Pages I-XI
Basic Concepts....Pages 1-36
Temporal Analysis of GERT Networks....Pages 37-55
STEOR Networks and EOR Networks....Pages 56-94
Reducible GERT Networks....Pages 95-115
Scheduling with GERT Precedence Constraints....Pages 116-175
Cost Minimization for STEOR and EOR Networks....Pages 176-197
Cost and Time Minimization for Decision Project Networks....Pages 198-226
Back Matter....Pages 227-240
β¦ Subjects
Operations Research/Decision Theory; Organization/Planning
π SIMILAR VOLUMES
The Practical, Precise, and Proven Approach to Integrated Cost and Schedule Control! This trusted project management resource, now in its second edition, includes expanded coverage of how integrated cost and schedule control works within the federal government. With the renewed emphasis on transpare
Reasons and methodologies for proper planning, monitoring, and controlling construction project costs and schedule<br /><br />The key to successful construction project control is the fusing of cost to schedule, enabling the management of one to help the management of the other. This requires that a
<p>Management and administrative processes within the construction industry have been undergoing major changes in the last several decades. These changes have involved significant adjustments in management science and manageΒ ment techniques, brought about by the need for contemporary valid informaΒ
Part 1. Scheduling Without Resources -- The PERT/CPM Technique -- The Critical Path Method -- The VMW Project -- Schedule Risk Analysis -- The Mutum-ParanaΜ II Bridge Project (A) -- Introduction -- Part 2. Scheduling with Resources -- Resource-Constrained Project Scheduling -- Resource-Constrained