We consider sequencing n jobs on a single machine subject to job completion times arising from either machine breakdowns or other causes. The objective is to minimize an expected weighted combination of due dates, completion times, earliness, and tardiness penalties. The determination of optimal dis
Single-machine scheduling with early and tardy completion costs
β Scribed by J. Steve Davis; John J. Kanet
- Publisher
- John Wiley and Sons
- Year
- 1993
- Tongue
- English
- Weight
- 930 KB
- Volume
- 40
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
β¦ Synopsis
We address a single-machine scheduling problem in which penalties are assigned for early and tardy completion of jobs. These penalties are common in industrial settings where early job completion can cause the cash commitment to resources in a time frame earlier than needed, giving rise to early completion penalties. Tardiness penalties arise from a variety of sources, such as loss of customer goodwill, opportunity costs of lost sales, and direct cash penalties. Accounting for earliness cost makes the performance measure nonregular, and this nonregularity has apparently discouraged researchers from seeking solutions to this problem. We found that it is not much more difficult to design an enumerative search for this problem than it would be if the performance measure were regular. We present and demonstrate an efficient timetabling procedure which can be embedded in an enumerative algorithm allowing the search to be conducted over the domain of job permutations.
π SIMILAR VOLUMES
This article deals with a single-machine n job earliness-tardiness model with jobindependent penalties. It demonstrates that the arrangement of adjacent jobs in an optimal schedule depends on a critical value of the start times. Based on these precedence relations, the article develops criteria unde
The article deals with a single machine earliness-tardiness scheduling model where idle times are permitted in job processing. Based on a cluster concept we develop properties of the model that lead to a very fast algorithm to find an optimal timing schedule for a given sequence of jobs. The perform
## Abstract In this paper, a singleβmachine scheduling problem with weighted earliness and tardiness penalties is considered. Idle time between two adjacent jobs is permitted and due dates of jobs could be unequal. The dominance rules are utilized to develop a relationship matrix, which allows a br