Single machine scheduling with a restricted rate-modifying activity
β Scribed by Yong He; Min Ji; T. C. E. Cheng
- Publisher
- John Wiley and Sons
- Year
- 2005
- Tongue
- English
- Weight
- 120 KB
- Volume
- 52
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
This paper examines scheduling problems in which the setup phase of each operation needs to be attended by a single server, common for all jobs and different from the processing machines. The objective in each situation is to minimize the makespan. For the processing system consisting of two paralle
This paper analyzes the Smith-heuristic for the single-machine scheduling problem where the objective is to minimize the total weighted completion time subject to the constraint that the tardiness for any job does not exceed a prespecified maximum allowable tardiness. We identify several cases of th
We examine the problem of scheduling n jobs with a common due date on a single machine. The processing time ofeach job is a random variable, which follows an arbitrary distribution with a known mean and a known variance. The machine is not reliable; it is subject to stochastic breakdowns. The objec
## Abstract ## Objective To assess the efficacy of lowβdose prednisolone on joint damage and disease activity in patients with early rheumatoid arthritis (RA). ## Methods At the start of their initial treatment with a diseaseβmodifying antirheumatic drug (DMARD), patients with early (duration β€1