Single machine scheduling to minimize the number of late jobs under uncertainty
β Scribed by Shao Chin Sung; Milan Vlach
- Publisher
- Elsevier Science
- Year
- 2003
- Tongue
- English
- Weight
- 227 KB
- Volume
- 139
- Category
- Article
- ISSN
- 0165-0114
No coin nor oath required. For personal study only.
β¦ Synopsis
In this paper, we deal with the problem of sequencing a ΓΏnite number of jobs for processing by a single machine with the objective of minimizing the number of jobs that are not completed by their due dates. We propose a rather general model based on an algebraic approach. By specifying suitable binary relations between due dates, between processing times, and between due dates and job completion times, a number of well-known results for deterministic, stochastic, and fuzzy environments can be obtained as special cases of presented general results. We show that in this general setting, variants of Jackson's lemma are valid and optimal sequences can be obtained by modiΓΏcations of Moore's algorithm for a wide range of binary relations and a wide range of types of job completion times.
π SIMILAR VOLUMES
We develop polynomial algorithms for several cases of the NP-hard open shop scheduling problem of minimizing the number of late jobs by utilizing some recent results for the open shop makespan problem. For the two machine common due date problem, we assume that either the machines or the jobs are or