๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Single machine scheduling problems with financial resource constraints: Some complexity results and properties

โœ Scribed by Evgeny R. Gafarov; Alexander A. Lazarev; Frank Werner


Publisher
Elsevier Science
Year
2011
Tongue
English
Weight
259 KB
Volume
62
Category
Article
ISSN
0165-4896

No coin nor oath required. For personal study only.

โœฆ Synopsis


We consider single machine scheduling problems with a non-renewable resource. These types of problems have not been intensively investigated in the literature so far. For several problems of these types with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity results. Particular attention is given to the problem of minimizing total tardiness. In addition, for the so-called budget scheduling problem with minimizing the makespan, we present some properties of feasible schedules.


๐Ÿ“œ SIMILAR VOLUMES