๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Setup Cost Reduction in (Q, r) Policy with Lot Size, Setup Time and Lead-Time Interactions

โœ Scribed by M. A. Hariga


Book ID
124857113
Publisher
Palgrave Publishers Ltd.
Year
2000
Tongue
English
Weight
295 KB
Volume
51
Category
Article
ISSN
0160-5682

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Lot sizing with quality improvement and
โœ Jรณzsef Vรถrรถs ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 130 KB

In this paper we develop a model that considers process quality improvement and setup cost reduction. The distinctive characteristics of our model are embodied in the assumptions that production rate is ยฎnite and cost of attaining close to zero setup time is not inยฎnite. Additionally, the process la

Incentives for overhead cost reduction:
โœ G.G. Hegde; Nandu J. Nagarajan ๐Ÿ“‚ Article ๐Ÿ“… 1992 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 977 KB

This paper addresses Incentive issues arising in the integration of production control and process improvement on the shop floor. High overhead rate estimates identified by an activity based costing (ABC) system can result in a decision to increase lot sizes, thereby reducing setup related overhead