Sequential imperfect preventive maintenance policies: A case study
โ Scribed by V. Jayabalan; Dipak Chaudhuri
- Publisher
- Elsevier Science
- Year
- 1992
- Tongue
- English
- Weight
- 414 KB
- Volume
- 32
- Category
- Article
- ISSN
- 0026-2714
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
In this article we consider a cumulative damage shock model under a periodic preventive maintenance (PM) policy. The PM is imperfect in the sense that each PM reduces the damage level by lOO(1 -b)%, 0 5 6 5 1. A system suffers damage due to shocks and fails when the damage level exceeds some thresho
Reliability centered maintenance (RCM) incorporates sound guidance for managers who wish to attain high standards of maintenance at their operating plants. Since the amount and type of maintenance which is applied depend strongly on the machine or components age (DFR, CFR or IFR), on its replacement