๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Sequencing with setup time and order tardiness trade-offs

โœ Scribed by Ching-Jong Liao; Cheng-Hsing Chuang


Publisher
John Wiley and Sons
Year
1996
Tongue
English
Weight
866 KB
Volume
43
Category
Article
ISSN
0894-069X

No coin nor oath required. For personal study only.

โœฆ Synopsis


We consider the problem ofschedulingcustomer orders on a single facility where each order consists of several jobs that can be clustered into several groups. When a facility is changed over to another group, a setup time associated with the new group is required. Two particular problems are considered in this context. One is to consider the total setup time and the number of tardy orders jointly. The other is to consider the total setup time and the maximum tardiness jointly. The total setup time in both problems represents a measure of internal efficiency, whereas the number of tardy orders and the maximum tardiness represent a measure of external efficiency. In any shop, the decision maker must consider the tradeoffs between large setup costs associated with a more frequent changeover schedule versus the cost of tardy orders that might be induced by a less-frequent changeover schedule. In this article branch-and-bound algorithms are proposed to identify the set of nondominated schedules for the two bicriteria problems. 1996 John Wiley & Sons. Inc.


๐Ÿ“œ SIMILAR VOLUMES


Production sequencing problem with reent
โœ Hark Hwang; Ji Ung Sun ๐Ÿ“‚ Article ๐Ÿ“… 1997 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 241 KB

This paper addresses a shop scheduling problem for the side flame press shop in a truck manufacturing company. In the problem, a set ofn jobs to be scheduled on two machines. All the jobs require processing by the first machine more than once in their operation sequences with reentrant work flows. A

Scheduling flowshops with finite buffers
โœ Bryan A Norman ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 145 KB

In this paper we explore ยฏowshop scheduling problems containing both sequence-dependent setup times and ยฎnite buers. To the best of our knowledge, problems containing both of these complexities have not been addressed previously in the literature. The problem is clearly NP-hard and therefore we only

Scheduling with two job classes and setu
โœ Jatinder N.D. Gupta; Johnny C. Ho ๐Ÿ“‚ Article ๐Ÿ“… 1996 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 969 KB

This paper considers the problem of minimizing the number of tardy jobs to be processed on a single machine with two job classes where a job's setup time depends on its job class. This is an increasinbly important problem due to the growing popularity of group technology manufacturing techniques, wh

Single machine scheduling with past-sequ
โœ Chuanli Zhao; Hengyong Tang ๐Ÿ“‚ Article ๐Ÿ“… 2010 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 180 KB

This paper considers single machine scheduling problems with setup times and deteriorating jobs. The setup times are proportional to the length of the already processed jobs, that is, the setup times are past-sequence-dependent (p-s-d). It is assumed that the job processing times are defined by func