We develop polynomial algorithms for several cases of the NP-hard open shop scheduling problem of minimizing the number of late jobs by utilizing some recent results for the open shop makespan problem. For the two machine common due date problem, we assume that either the machines or the jobs are or
โฆ LIBER โฆ
Scheduling unit time open shops to minimize the weighted number of late jobs
โ Scribed by Peter Brucker; Bernd Jurisch; Thomas Tautenhahn; Frank Werner
- Publisher
- Elsevier Science
- Year
- 1993
- Tongue
- English
- Weight
- 365 KB
- Volume
- 14
- Category
- Article
- ISSN
- 0167-6377
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Open shop scheduling to minimize the num
โ
Christos Koulamas; George J. Kyparisis
๐
Article
๐
1998
๐
John Wiley and Sons
๐
English
โ 63 KB
๐ 2 views
Single-machine scheduling to minimize th
โ
Chung-Lun Li; T.C.E. Cheng; Z.-L. Chen
๐
Article
๐
1995
๐
Elsevier Science
๐
English
โ 866 KB
Level scheduling to minimize schedule le
โ
Michael B. Richey
๐
Article
๐
1991
๐
Elsevier Science
๐
English
โ 148 KB
Scheduling jobs with release times preem
โ
Nodari Vakhania
๐
Article
๐
2009
๐
Elsevier Science
๐
English
โ 910 KB
A note on the complexity of family sched
โ
T. C. Edwin Cheng; Zhaohui Liu; Yakov M. Shafransky
๐
Article
๐
2001
๐
Springer US
๐
English
โ 65 KB
๐ 2 views
The single-machine family scheduling problem of minimizing the number of late jobs has been known to be NP-hard, but whether it is NP-hard in the strong sense is cited as an open problem in several reviews. In this note, we prove that this problem is strongly NP-hard even if all set-up times and pro
Heterogeneous-criteria scheduling: Minim
โ
Jon M. Peha
๐
Article
๐
1995
๐
Elsevier Science
๐
English
โ 981 KB