𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Scheduling stochastic jobs with asymmetric earliness and tardiness penalties

✍ Scribed by X. Cai; S. Zhou


Publisher
John Wiley and Sons
Year
1997
Tongue
English
Weight
158 KB
Volume
44
Category
Article
ISSN
0894-069X

No coin nor oath required. For personal study only.

✦ Synopsis


We consider a stochastic counterpart of the well-known earliness-tardiness scheduling problem with a common due date, in which n stochastic jobs are to be processed on a single machine. The processing times of the jobs are independent and normally distributed random variables with known means and known variances that are proportional to the means. The due dates of the jobs are random variables following a common probability distribution. The objective is to minimize the expectation of a weighted combination of the earliness penalty, the tardiness penalty, and the flow-time penalty. One of our main results is that an optimal sequence for the problem must be V-shaped with respect to the mean processing times. Other characterizations of the optimal solution are also established. Two algorithms are proposed, which can generate optimal or near-optimal solutions in pseudopolynomial time. The proposed algorithms are also extended to problems where processing times do not satisfy the assumption in the model above, and are evaluated when processing times follow different probability distributions, including general normal (without the proportional relation between variances and means), uniform, Laplace, and exponential. α­§ 1997


πŸ“œ SIMILAR VOLUMES


Adjacent orderings in single-machine sch
✍ Wlodzimierz Szwarc πŸ“‚ Article πŸ“… 1993 πŸ› John Wiley and Sons 🌐 English βš– 771 KB

This article deals with a single-machine n job earliness-tardiness model with jobindependent penalties. It demonstrates that the arrangement of adjacent jobs in an optimal schedule depends on a critical value of the start times. Based on these precedence relations, the article develops criteria unde

Minimizing weighted earliness and tardin
✍ Jaw-Yeh Chen; Sheng-Fuu Lin πŸ“‚ Article πŸ“… 2002 πŸ› John Wiley and Sons 🌐 English βš– 169 KB

## Abstract In this paper, a single‐machine scheduling problem with weighted earliness and tardiness penalties is considered. Idle time between two adjacent jobs is permitted and due dates of jobs could be unequal. The dominance rules are utilized to develop a relationship matrix, which allows a br

Scheduling jobs with random processing t
✍ X. Cai; F. S. Tu πŸ“‚ Article πŸ“… 1996 πŸ› John Wiley and Sons 🌐 English βš– 942 KB

We examine the problem of scheduling n jobs with a common due date on a single machine. The processing time ofeach job is a random variable, which follows an arbitrary distribution with a known mean and a known variance. The machine is not reliable; it is subject to stochastic breakdowns. The objec