Scheduling of a single machine to minimize total weighted completion time subject to release dates
โ Scribed by Lucio Bianco; Salvatore Ricciardelli
- Publisher
- John Wiley and Sons
- Year
- 1982
- Tongue
- English
- Weight
- 764 KB
- Volume
- 29
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
โฆ Synopsis
Abstract
In this paper the n/1/r~j~ ฮฃ~j~ w~j~ C~j~ problem under the assumptions of nonpreemptive sequencing and sequence independent processing times is investigated. After pointing out the fundamental properties, some dominance sufficient conditions among sequences are obtained and a branch and bound algorithm is proposed. Computational results are reported and discussed.
๐ SIMILAR VOLUMES
## Abstract The machine scheduling literature does not consider the issue of tool change. The parallel literature on tool management addresses this issue but assumes that the change is due only to part mix. In practice, however, a tool change is caused most frequently by tool wear. That is why we c
We examine the problem of scheduling n jobs with a common due date on a single machine. The processing time ofeach job is a random variable, which follows an arbitrary distribution with a known mean and a known variance. The machine is not reliable; it is subject to stochastic breakdowns. The objec