Scheduling in an MRP environment
✍ Scribed by Gürsel A. Süer; Rafael A. Lizardi
- Publisher
- Elsevier Science
- Year
- 1993
- Tongue
- English
- Weight
- 308 KB
- Volume
- 25
- Category
- Article
- ISSN
- 0360-8352
No coin nor oath required. For personal study only.
📜 SIMILAR VOLUMES
Traditional research in scheduling has concentrated on developing optimal and optional tending heuristic algorithms for n x m job shop and flow shop problems. Relatively no work has been conducted in the area of scheduling within a GT cell. This paper examines the GT cell environment from a scheduli
Under single-level lot-sizing problem, well known Wagner-Whitin algorithm based on Dynamic Programming (DP) provides optimal order schedule. Order schedule does not work properly under Manufacturing Resource Planning (MRP II), where it is considered multi-level capaeitated problem and requirements o