Schedule of n jobs on two identical machines to minimize weighted mean flow time
β Scribed by Bahram Alidaee
- Publisher
- Elsevier Science
- Year
- 1993
- Tongue
- English
- Weight
- 209 KB
- Volume
- 24
- Category
- Article
- ISSN
- 0360-8352
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
AbstractΓWe consider the problem of scheduling n identical jobs with unequal ready times on m parallel uniform machines to minimize the maximum lateness. This paper develops a branch-and-bound procedure that optimally solves the problem and introduces six simple single-pass heuristic procedures that
## 2003-2004 abstract and ke cword index specifically identify M. parafortuitum among a mixed microbial community in MWE It is also shown that the M. parafortuitum labeling methods are insensitive to the synthetic, semi-synthetic, and soluble oil MWF chemistries investigated. In addition, the use