𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Road tunnel early cost estimates using multiple regression analysis

✍ Scribed by Cleopatra Petroutsatou; Sergios Lambropoulos; John-Paris Pantouvakis


Book ID
105663910
Publisher
Springer-Verlag
Year
2006
Tongue
English
Weight
810 KB
Volume
6
Category
Article
ISSN
1109-2858

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Using multiple regression analysis to es
✍ Izuho Hirano; Masahiko Kondo; Youichi Uraki; Yasuyuki Asahara πŸ“‚ Article πŸ“… 1999 πŸ› Elsevier Science 🌐 English βš– 601 KB

The respective contributions of combustion noise, mechanical noise, load-dependent noise and other engine noise components must be identi"ed in order to devise e!ective measures for reducing diesel engine noise under full load operation. This paper describes a method for estimating the contributions

The use of goal programming, regression
✍ D. Giokas πŸ“‚ Article πŸ“… 2002 πŸ› John Wiley and Sons 🌐 English βš– 121 KB

## Abstract This paper presents a new composite methodology for estimating efficient marginal costs of outputs. The methodology is based on multi‐criteria methods involving Data Envelopment Analysis (DEA), Goal Programming (GP) and Regression Analysis (RA) techniques. Firstly, DEA is used to find a