Due-date assignment and maintenance acti
✍
Gur Mosheiov; Daniel Oron
📂
Article
📅
2006
🏛
Elsevier Science
🌐
English
⚖ 171 KB
In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The pro