๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Resource-constrained construction project scheduling model for profit maximization considering cash flow

โœ Scribed by Shu-Shun Liu; Chang-Jung Wang


Publisher
Elsevier Science
Year
2008
Tongue
English
Weight
487 KB
Volume
17
Category
Article
ISSN
0926-5805

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A metaheuristic scheduling procedure for
โœ Dan Zhu; Rema Padman ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 244 KB ๐Ÿ‘ 2 views

Resource-constrained project scheduling problems with cash flows (RCPSPCF) are complex, combinatorial optimization problems. Many heuristics have been reported in the literature that produce reasonable schedules in limited project environments. However, the lack of a heuristic that dominates under d