Relocating and reestablishing a robotics laboratory
โ Scribed by Stephen Scypinski; Theodore Sadlowski; John Baiano
- Publisher
- John Wiley and Sons
- Year
- 1997
- Tongue
- English
- Weight
- 192 KB
- Volume
- 9
- Category
- Article
- ISSN
- 0895-7533
No coin nor oath required. For personal study only.
โฆ Synopsis
Over the past several years, there have been many presentations at various International Symposium on Laboratory Automation and Robotics Meetings (ISLAR) devoted to the trials and tribulations of establishing a robotics facility in an existing laboratory environment. Recently, we in the Analytical R&D Department at Hoffmann-La Roche have had the good fortune (or painful task) of moving out of an existing laboratory into a newly constructed building. The new laboratory was specifically designed to accommodate robotic systems and was not "converted" from a laboratory already in use. This allowed the greatest efficiency in the use of space and in design of services needed for the systems. It was also a learning experience with regard to areas such as building, electrical utility, and municipal codes. The room was even outfitted with its own high-pressure water system to supply the cleaning stations on the robots.
Once the laboratory was completed and a certificate of occupancy was obtained, we faced the task of moving the robotic systems. This monumental task of disassembling, packing, moving, and then reassembling three Py systems as well as the various
๐ SIMILAR VOLUMES
A commercial laboratory robot has been programmed to prepare up to 144 soil samples for pH determination. The soils are manually scooped into tubes (as part of our receiving service>, and loaded into racks capable of holding 40 tubes each. The robot determines the weight of soil in each tube (if req