𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Proceedings of the Tunnel Day 2008


Book ID
102844807
Publisher
Wiley (John Wiley & Sons)
Year
2009
Tongue
English
Weight
691 KB
Volume
2
Category
Article
ISSN
1865-7362

No coin nor oath required. For personal study only.

✦ Synopsis


Abstract

The construction of the first tube of the Tauern tunnels in the years 1970 to 1975 was a milestone in the development of the NATM and of modern tunnelling. The driving of the second tube of the Tauern tunnel between 2006 and 2008 has shown that the basics of the NATM are still valid (see pages 14 ff and 24 ff).


πŸ“œ SIMILAR VOLUMES