𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Priority service and outage costs in the power sector: The Taiwan experience

✍ Scribed by George J.Y. Hsu; Tser-yieth Chen


Publisher
Elsevier Science
Year
1993
Tongue
English
Weight
793 KB
Volume
3
Category
Article
ISSN
0957-1787

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


98/00865 The cost of power outages in th
πŸ“‚ Article πŸ“… 1998 πŸ› Elsevier Science βš– 210 KB

A treatment method for waste plastics in the manufacture of coke is described. It involves drying a coal charge mixed with waste plastics in an inclined rotary cylindrical drying apparatus or at a temperature lower than melting point of waste plastics to 2-6 wt% water content and loading the coal ch

Evaluation of the marginal outage costs
✍ Raymond F. Ghajar πŸ“‚ Article πŸ“… 1998 πŸ› John Wiley and Sons 🌐 English βš– 143 KB πŸ‘ 2 views

Marginal outage costs are an important component of electricity spot prices. This paper describes a methodology based on quantitative power system reliability techniques for calculating these costs in generating systems. The proposed method involves the calculation of the incremental expected unserv

Multi-criteria decision analysis and cos
✍ D. Diakoulaki; F. Karangelis πŸ“‚ Article πŸ“… 2007 πŸ› Elsevier Science 🌐 English βš– 146 KB

This paper examines four mutually exclusive scenarios for the expansion of the Greek electricity system developed by official authorities and representing alternative views on meeting electricity demand. The aim is to encompass all positive and negative side-effects characterizing the electricity ge