In some Β―exible manufacturing systems (FMSs), limited tool magazine capacity requires grouping of parts into subsets for production. Although several studies have addressed the part grouping issue, research comparing the performance of models is scanty. Moreover, there is no congruency in the object
Priority algorithms for makespan minimization in the subset model
β Scribed by Oded Regev
- Publisher
- Elsevier Science
- Year
- 2002
- Tongue
- English
- Weight
- 63 KB
- Volume
- 84
- Category
- Article
- ISSN
- 0020-0190
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Minimal Unsatisfiable Subsets (MUSes) are the subsets of constraints of an overconstrained constraint satisfaction problem (CSP) that cannot be satisfied simultaneously and therefore are responsible for the conflict in the CSP. In this paper, we present a hybrid algorithm for finding MUSes in overco
We consider scheduling of a deteriorating flexible machine that is capable of processing a number of diverse jobs with negligible setup times between jobs. Specifically, we develop rules for sequencing N jobs on such a machine such that its expected makespan (sum of all job processing times and mach
We consider the two-machine ow-shop problem with release times where the objective is to minimize either the makespan or the maximum lateness. We present a uniΓΏed treatment of various sequenceinterchange operators and derive powerful new dominance orders, which are incorporated into branchand-bound