๐”– Scriptorium
โœฆ   LIBER   โœฆ

๐Ÿ“

Pipeline design for installation by horizontal directional drilling

โœ Scribed by Horizontal Directional Drilling Design Guideline Task Committee; Eric R. Skonberg, Tennyson M. Muindi (editors)


Publisher
American Society of Civil Engineers
Year
2014
Tongue
English
Leaves
80
Series
ASCE manuals and reports on engineering practice no. 108
Edition
2
Category
Library

โฌ‡  Acquire This Volume

No coin nor oath required. For personal study only.

โœฆ Synopsis


Prepared by the Horizontal Directional Drilling Design Guideline Task Committee of the Technical Committee on Trenchless Installation of Pipeline Systems of the Pipeline Division of ASCE
This Manual of Practice addresses the design of major pipeline or duct segments to be installed by horizontal directional drilling (HDD). HDD is a trenchless excavation method that is accomplished in three phases and uses a specialized horizontal drilling rig with ancillary tools and equipment. Topics include predesign surveys, drilled path design, pipe design, construction impact, and as-built documentation. This new edition captures advances in drilling equipment, improvements for tracking, and considerations for using alternative pipe materials.
MOP 108 is a guide for design engineers who have previous experience and knowledge of the HDD installation process and pipeline design methods.

โœฆ Table of Contents


Content: ""Cover""
""CONTENTS""
""CONTRIBUTORS""
""1. INTRODUCTION""
""1.1 Scope""
""2. PREDESIGN SURVEYS""
""2.1 Introduction""
""2.2 Surface Survey""
""2.3 Subsurface Investigation""
""References""
""3. DRILLED PATH DESIGN""
""3.1 Introduction""
""3.2 Penetration Angles""
""3.3 Depth of Penetration""
""3.4 Radius of Curvature""
""3.5 Directional Accuracy and Tolerances""
""3.6 Drill-and-Intersect Method""
""3.7 Multiple-Line Installations""
""3.8 Casings""
""References""
""4. PIPE DESIGN""
""4.1 Introduction""
""4.2 Installation Loads""
""4.3 Operating Loads"" ""4.4 Pipe Material""""4.5 Stresses in Steel Pipe""
""4.6 Stresses in High-Density Polyethylene Pipe""
""4.7 Ductile Iron Pipe Design Considerations""
""4.8 Steel Pipe Corrosion Coating""
""References""
""5. CONSTRUCTION IMPACT""
""5.1 Introduction""
""5.2 Workspace""
""5.3 Drilling Fluid""
""References""
""6. AS-BUILT DOCUMENTATION""
""6.1 Introduction""
""6.2 Construction Staking""
""6.3 Documentation of Actual Drilled Path End Points""
""6.4 Required Measurements Prior to Commencing Drilling Operations""
""6.5 Pilot-Hole As-Built Calculations"" ""6.6 Pilot-Hole Survey Data""""6.7 Pilot-Hole As-Built Error Distribution""
""6.8 Pilot-Hole As-Built Drawing""
""6.9 Postinstallation Survey""
""References""
""GLOSSARY""
""A""
""B""
""C""
""D""
""E""
""F""
""G""
""H""
""I""
""J""
""L""
""M""
""O""
""P""
""R""
""S""
""T""
""V""
""W""
""INDEX""
""A""
""B""
""C""
""D""
""E""
""F""
""G""
""H""
""I""
""L""
""M""
""N""
""O""
""P""
""R""
""S""
""T""
""U""
""V""
""W""


๐Ÿ“œ SIMILAR VOLUMES


Pipeline design for installation by hori
โœ Horizontal Directional Drilling Design Guideline Task Committee of the Technical ๐Ÿ“‚ Library ๐Ÿ“… 2005 ๐Ÿ› American Society of Civil Engineers ๐ŸŒ English

Prepared by the Horizontal Directional Drilling Design Guideline Task Committee of the Technical Committee on Trenchless Installation of Pipelines of the Pipeline Division of ASCE. <em>Pipeline Design for Installation by Horizontal Directional Drilling</em> addresses the design of major pipeline or

Horizontal Directional Drilling: Utility
โœ David Willoughby ๐Ÿ“‚ Library ๐Ÿ“… 2004 ๐Ÿ› McGraw-Hill Professional ๐ŸŒ English

Comprehensive coverage of horizontal directional drilling (HDD) technologies and applicationsAn essential resource for anyone working in the trenchless industry, this authoritative guide provides complete technical information on the design, permitting, construction bid documents, specifications, an