Particulate scrubbing in a novel two-stage hybrid scrubber
β Scribed by Amitava Bandyopadhyay; Manindra Nath Biswas
- Publisher
- American Institute of Chemical Engineers
- Year
- 2006
- Tongue
- English
- Weight
- 109 KB
- Volume
- 52
- Category
- Article
- ISSN
- 0001-1541
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unrelated machines and renewable resources at both the stages. The resource requirements are of a 0-1 type. The objective is the minimization of makespan. The problem is NP-hard. Four heuristic algorithm
## Abstract Since most intracellular proteins are expressed with their ligands, ligands of cancerβtestis (CT) antigens may also be CT in their distribution. Applying Sperm protein 17 (Sp17) as the bait in a yeast 2βhybrid system of a testicular cDNA library, 17 interacting clones were isolated and
The occurrence of a t(15;22) translocation in a peripheral primitive neuroectodermal tumour (pPNET) has been previously reported. Molecular examination revealed the presence in tumour mRNA of two hybrid transcripts containing the 5 portion of the EWS gene fused to the 3 portion of the ERG gene. Sequ