𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Optimal resource leveling using non-serial dyanamic programming

✍ Scribed by M. Bandelloni; M. Tucci; R. Rinaldi


Publisher
Elsevier Science
Year
1994
Tongue
English
Weight
859 KB
Volume
78
Category
Article
ISSN
0377-2217

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Confidence structural robust optimizatio
✍ Xu Guo; Jianming Du; Xixin Gao πŸ“‚ Article πŸ“… 2010 πŸ› John Wiley and Sons 🌐 English βš– 286 KB

## Abstract Structural robust optimization problems are often solved via the so‐called Bi‐level approach. This solution procedure often involves large computational efforts and sometimes its convergence properties are not so good because of the non‐smooth nature of the Bi‐level formulation. Another

Design and Management Optimization of Tr
✍ J.C.C. Saad; J.A. Frizzone πŸ“‚ Article πŸ“… 1996 πŸ› Elsevier Science 🌐 English βš– 456 KB

A non-linear model is presented which optimizes the lay-out , as well as the design and management of trickle irrigation systems , to achieve maximum net benefit . The model consists of an objective function that maximizes profit at the farm level , subject to appropriate geometric and hydraulic con

The optimization of non-linear systems u
✍ Mohamed Hassan; Madan G. Singh πŸ“‚ Article πŸ“… 1976 πŸ› Elsevier Science 🌐 English βš– 362 KB

A new two level method is developed for the optimization of non-linear dynamical systems with a quadratic cost function. This method used an expansion around the equilibrium point of the system to fix the second and higher order terms. These terms are compensated for iteratively at the second level