𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Optimal production lot sizing with rework, scrap rate, and service level constraint

✍ Scribed by Singa Wang Chiu; Chia-Kuan Ting; Yuan-Shyi Peter Chiu


Publisher
Elsevier Science
Year
2007
Tongue
English
Weight
877 KB
Volume
46
Category
Article
ISSN
0895-7177

No coin nor oath required. For personal study only.