On the optimal allocation of customers that must depart in sequence
β Scribed by Joy Kuri; Anurag Kumar
- Publisher
- Elsevier Science
- Year
- 1994
- Tongue
- English
- Weight
- 372 KB
- Volume
- 15
- Category
- Article
- ISSN
- 0167-6377
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Components C 1 and C 2 form a series system. Suppose we can allocate the spare R 1 in parallel with C 1 and the spare R 2 in parallel with C 2 , or otherwise, allocate R 1 with C 2 and R 2 with C 1 . In this paper, we compare these two options using hazard rate ordering.
Let X 1 and X 2 be independent random variables representing the lifetimes of the components C 1 and C 2 , and Y 1 and Y 2 be random variables, independent of X 1 and X 2 , representing the lifetimes of the spares R 1 and R 2 , respectively. Suppose that the components C 1 and C 2 form a series syst
## Abstract Drought is common to Iran and the agricultural sector is its main victim. Reducing demand for irrigation water is considered the best management practice to alleviate losses. An equitable water reduction approach has been traditionally applied in the management of irrigation systems. Th
Exposure to aflatoxin B 1 (AFB 1 ) is one of the risk factors for developing hepatoma. In rats, activation of the ras gene is a prevalent event in AFB 1 -induced hepatocarcinogenesis. It is not clear whether a similar event occurs in humans. By analysis of codon 249 of the p53 gene, six of 36 human