We investigate some real time behaviour of a (discrete time) single server system with nonpreemptive LCFS task scheduling. The main results deal with the probability distribution of a random variable \(\operatorname{SRD}(T)\), which describes the time the system operates without any violation of a f
On-line scheduling with tight deadlines
โ Scribed by Chiu-Yuen Koo; Tak-Wah Lam; Tsuen-Wan Ngan; Kunihiko Sadakane; Kar-Keung To
- Publisher
- Elsevier Science
- Year
- 2003
- Tongue
- English
- Weight
- 136 KB
- Volume
- 295
- Category
- Article
- ISSN
- 0304-3975
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
We study non-preemptive, online admission control in the hard deadline model: each job must either be serviced prior to its deadline or be rejected. Our setting consists of a single resource that services an online sequence of jobs; each job has a length indicating the length of time for which it ne
In this paper, we study the problem of scheduling n independent jobs non-preemptively on m unrelated parallel machines. Each job j has a processing time and a deadline, the time at which the job must be completed. On each machine, jobs may be grouped to form batches containing continuously scheduled
We consider the problem of deciding if there is a feasible preemptive schedule for a set of n independent tasks with release times and deadlines on m identical processors. The general problem is known to be solvable in O(n 3) time. In this paper, we study special cases for which faster algorithms ex