๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

NP-completeness of minimum spanner problems

โœ Scribed by Leizhen Cai


Publisher
Elsevier Science
Year
1994
Tongue
English
Weight
544 KB
Volume
48
Category
Article
ISSN
0166-218X

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


NP-complete scheduling problems
โœ J.D. Ullman ๐Ÿ“‚ Article ๐Ÿ“… 1975 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 423 KB

We show that the problem of finding an optimal schedule for a set of jobs is NPcomplete even in the following two restricted cases. (1) All jobs require one time unit. (2) All jobs require one or two time units, and there are only two processor resolving (in the negative a conjecture of R. L. Grah

On the np-completeness of certain networ
โœ S. Even; O. Goldreich; S. Moran; P. Tong ๐Ÿ“‚ Article ๐Ÿ“… 1984 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 946 KB

Let G ( V , E) be an undirected graph which describes the structure of a communication network. During the maintenance period every line must be tested in each of the two possible directions. A line is tested by assigning one of its endpoints t o be a transmitter, the other to be a receiver, and sen

Minimum spanners of butterfly graphs
โœ Shien-Ching Hwang; Gen-Huey Chen ๐Ÿ“‚ Article ๐Ÿ“… 2001 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 251 KB