## Abstract EU financing for most important TEN projects is guaranteed Construction contract 1 awarded for the Koralm tunnel Civil Works awarded for the European XFEL Partial opening at the Lainzer tunnel project Records at the Cabrera tunnel NFM Technologies delivers two EPB machines for the
News: Geomechanics and Tunnelling 2/2009
- Book ID
- 102224871
- Publisher
- Wiley (John Wiley & Sons)
- Year
- 2009
- Tongue
- English
- Weight
- 353 KB
- Volume
- 2
- Category
- Article
- ISSN
- 1865-7362
No coin nor oath required. For personal study only.
✦ Synopsis
Abstract
Breakthrough in the Raingruben tunnel
Breakthrough at new Schlüchtern Tunnel
Tunnel breakthrough on the new Lower Inn Valley railway line
Piora syncline definitively and successfully mastered
Ground‐breaking ceremony at the Osterberg Tunnel
Mexico City prepares for the largest drainage system in the world
Call for papers – Themes for the next issues of Geomechanics and Tunnelling
📜 SIMILAR VOLUMES
## Abstract The main tunnel drives in the Lower Inn valley are complete Breakthrough in the Hengsberg tunnel Deutsche Bahn awards two railway tunnels to Alpine Deutsche Bahn awards Silberberg tunnel to joint venture Robbins single shield for Laos headrace tunnel Katschberg tunnel in full opera
## Abstract Gotthard Base Tunnel: breakthrough between Erstfeld and Amsteg Last tunnel breakthrough on the Lainzer Tunnel project Start of the installation of railway equipment on the Lower Inn Valley line Main contract awarded for the Ceneri Base Tunnel Bilfinger Berger awarded contract for a
## Abstract Ground‐breaking ceremony celebrated at the second longest tunnel on the new railway line Ebensfeld‐Erfurt – Anschlagfeier für zweitlängsten Tunnel der Eisenbahn‐Neubaustrecke Ebensfeld‐Erfurt Ground‐breaking ceremony of the Burgstaller Tunnel in the Ybbs‐Amstetten gap‐closing project –
## Abstract Topic: Prediction of TBM performance / Prognose von TBM Vortriebsleistungen __Karlheinz Gehring:__ Influence of TBM design and machine features on performance and tool consumption in rock / Einfluss von TBM‐Design und Maschinentechnik auf Leistung und Werkzeugverschleiß im Fels __Erns