๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Multiple period repair kit problem with a job completion criterion: A case study

โœ Scribed by D. Heeremans; L.F. Gelders


Publisher
Elsevier Science
Year
1995
Tongue
English
Weight
670 KB
Volume
81
Category
Article
ISSN
0377-2217

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A study on limited-cycle scheduling prob
โœ Hisashi Yamamoto; Jing Sun; Masayuki Matsui ๐Ÿ“‚ Article ๐Ÿ“… 2010 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 698 KB

This paper considers the optimal arrangement to minimize the total expected risk on limited-cycle scheduling problem with multiple periods. In this paper, first, the multi period problem is systematically classified and modeled. Next, a recursive formula for the total expected risk is presented, and