The critical path method remains one of the most popular approaches in practical scheduling. Being developed for the makespan problem this method can also be generalized to the maximum lateness problem. For the unit execution time task system and parallel processors this generalization is known as t
Minimum and Worst-Case Performance Ratios of Rollout Algorithms
β Scribed by Luca Bertazzi
- Publisher
- Springer
- Year
- 2011
- Tongue
- English
- Weight
- 638 KB
- Volume
- 152
- Category
- Article
- ISSN
- 0022-3239
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Since the introduction of flexible manufacturing systems, researchers have investigated various planning and scheduling problems faced by the users of such systems. Several of these problems are not encountered in more classical production settings, and so-called tool management problems appear to b
## Abstract For point sets in the rectilinear plane, we consider the following five measures of the interconnect length and prove bounds on the worstβcase ratio: minimum Steiner tree, minimum star, clique, minimum spanning tree, and bounding box. In particular, we prove that, for any set of __n__ p