๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Minimizing makespan in a two-machine flow shop with effects of deterioration and learning

โœ Scribed by Ji-Bo Wang, P. Ji, T. C. E. Cheng, Dan Wang


Book ID
118815393
Publisher
Springer-Verlag
Year
2011
Tongue
English
Weight
193 KB
Volume
6
Category
Article
ISSN
1862-4472

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Minimizing the makespan in the two-machi
โœ M.L. Espinouse; P. Formanowicz; B. Penz ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 307 KB

This paper deals with the two-machine no-wait flow-shop problem with limited machine availability. In this model, we assume that machines may not always be available, for example because of preventive maintenance. We only consider the deterministic case where the unavailable periods are known in adv