Minimizing flowtime and maximum earliness on a single machine
β Scribed by Murat Koksalan; Meral Azizoglu; Suna Koksalan Kondakci
- Book ID
- 110250514
- Publisher
- Taylor and Francis Group
- Year
- 1998
- Tongue
- English
- Weight
- 227 KB
- Volume
- 30
- Category
- Article
- ISSN
- 0740-817X
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
We consider the scheduling of N jobs divided into G families for processing on a single machine. No set-up is necessary between jobs belonging to the same family. A set-up must be scheduled when switching from the processing of family i jobs to those of another family j, i = j, the duration of this
A moving block heuristic (MBH) is developed for earliness-tardiness scheduling problems, which are observed in just-in-time (JIT) production environments. The MBH is described for the single-machine environment under unrestrictive job due date conditions. The proposed MBH, which has polynomial compu