๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Material flow control and scheduling in a disassembly environment

โœ Scribed by Elif Kizilkaya; Surendra M. Gupta


Publisher
Elsevier Science
Year
1998
Tongue
English
Weight
313 KB
Volume
35
Category
Article
ISSN
0360-8352

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A continuous-time integrated model for d
โœ Konstantin Kogan ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 640 KB

An integrated dynamic model for discrete production scheduling and continuous capacity expansion is presented in this paper. The modeled manufacturing system, based on multi-level bills of materials, is characterized by ยฏexible machines with negligible setups and production rates ยฎxed for the curren

Analysis of project scheduling strategie
โœ Joshua B. Levy; Giri Kumar Tayi ๐Ÿ“‚ Article ๐Ÿ“… 1989 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 931 KB

In this article we consider a cost-minimization model to investigate scheduling strategies for multistaged projects in a client-contractor environment. This type of environment is symptomatic of temporal changes in project definition and scope. At prespecified epochs the client conducts an external