## FINANCIAL incorporates three 1000 kW cooling towers. The first test schedule undertaken was the witness test of a Weir vertical non-clog variable speed SRC 1200/1400 pump, driven by a 3000 kW 12-pole electric Teco motor through a 3000 kW Robicon variable frequency drive unit. This was part of
Maintenance and refurbishment agreements
- Book ID
- 104320922
- Publisher
- Elsevier Science
- Year
- 1999
- Tongue
- English
- Weight
- 350 KB
- Volume
- 1999
- Category
- Article
- ISSN
- 0262-1762
No coin nor oath required. For personal study only.
โฆ Synopsis
B us1NEss &
FIh'ANCIAL to Weir Pumps as part of the ongoing services are part of the years, to Weir Engineering modernisation and upgrade of two separate contracts that in-Services (WI%). Under the agreethe North South pipeline. At volved supplying Geho pistonment, WES will be responsible Qarn Alam pumping station, diaphragm pumps to the facili-for repair and maintenance of Weir will supply two very large, ties. In addition to maintenance more than 1200 water and high-pressure barrel-casing servicesweir also provides spare wastewater pumping stations, as pumps incorporating variable-parts inventory management well as chlorination, sludge speed drives, 5.5 MW motors and ongoing pump technology treatment and the upkeep of and huge air blast coolers, and materials development. five process waste incinerators. designed for use in an extreme A new partnership between More than 100 Yorkshire Water desert environment. At Nahada ITT Flygt and Morrison Con-employees will transfer to WES. pumping station, Weir will sup-struction will see both organisaply another large barrel-casing tions working closely on a major I
ESA concern over
pump to run alongside three UK pumping station refurbishexisting units the company sup-ment contract. This follows the
๐ SIMILAR VOLUMES
Service level agreements (SLAs) facilitate the business partnership between the customer and the service provider and have long been an integral part of the information technology (IT) service business. With the recent advancement of network operations and maintenance (O&M) services, SLAs are being
This paper models the pH changes which occur when reinforced concrete structures are cathodically protected by an externally applied DC current. It is shown that the cathodic area is initially made very alkaline immediately after switch-on, and the anodic area becomes acidic in nature. This acidic a