๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Machine Status of J-PARC

โœ Scribed by Masahito Tomizawa


Book ID
103869723
Publisher
Elsevier Science
Year
2006
Tongue
English
Weight
609 KB
Volume
154
Category
Article
ISSN
0920-5632

No coin nor oath required. For personal study only.

โœฆ Synopsis


The J-PARC accelerator complex comprises a linear accelerator (linac), a rapid cycle synchrotron (RCS) and 50 GeV main ring (MR). The complex can provide a high power proton beam for the experimental facilities. Construction of the J-PARC started in 2001. The beam commissioning of the linac and the RCS will start in 2006 and 2007, respectively. The MR bream commissioning for the neutrino experiment will start in 2009. An outline and a present status of the accelerator complex will be presented in this paper. The present beam power schedule of the RCS and the MR is shown. We have started a discussion to obtain a higher MR beam power as soon as possible beyond the present scheme.


๐Ÿ“œ SIMILAR VOLUMES


J-PARC status update
โœ Yujiro Ikeda ๐Ÿ“‚ Article ๐Ÿ“… 2009 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 694 KB
Status of the Superomega Muon Beam Line
โœ Yutaka Ikedo; Yasuhiro Miyake; Koichiro Shimomura; Patrick Strasser; Kusuo Nishi ๐Ÿ“‚ Article ๐Ÿ“… 2012 ๐Ÿ› Elsevier ๐ŸŒ English โš– 458 KB
J-PARC project
โœ Shoji Nagamiya ๐Ÿ“‚ Article ๐Ÿ“… 2004 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 595 KB