𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Limnological Features of a Tropical Meromictic Lake

✍ Scribed by E. G. Bozniak; N. S. Schanen; B. C. Parker; C. M. Keenan


Publisher
Springer
Year
1969
Tongue
English
Weight
363 KB
Volume
34
Category
Article
ISSN
1573-5141

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Limnology of the Crater Lake Cuicocha, E
✍ GΓΌnter Gunkel; Camilla Beulker πŸ“‚ Article πŸ“… 2009 πŸ› John Wiley and Sons 🌐 English βš– 644 KB

## Abstract Cuicocha (3380 m a.s.l.) is a young, a few hundred years old volcanic lake in the western cordilleras of the Ecuadorian Andes with some post‐volcanic activities, such as emission of volcanic gases and input of hydrothermal water. Water chemistry is influenced by the emission of CO~2~ an

Limnological Features of a Tropical Impo
✍ Dr. A. Sreenivasan πŸ“‚ Article πŸ“… 1974 πŸ› John Wiley and Sons 🌐 English βš– 940 KB

## Abstract In the Bhavanisagar Reservoir a stable thermal stratification did not occur, but the thermal stability was fairly high. Oxygen deficits occurred frequently as well as complete anoxic conditions. Influx of flood waters improved the bottom oxygen conditions. This together with other facto

Limnological Studies in a Tropical Man-M
✍ Aida GonzΓ‘les De Infante; Otto Infante πŸ“‚ Article πŸ“… 1994 πŸ› John Wiley and Sons 🌐 English βš– 471 KB

The purpose of this study was to evaluate the present limnological conditions of Lagartijo reservoir (North central Venezuela) and to compare them with conditions reported in early studies. Lagartijo reservoir supplies an important part of the water demand for Caracas city and wide fluctuations on w

Lake Guri (Venezuela): Preliminary Limno
✍ Franz H. Weibezahn πŸ“‚ Article πŸ“… 1994 πŸ› John Wiley and Sons 🌐 English βš– 758 KB

The Caroni River, a tributary ofthe Orinoco River, in south-eastern Venezuela, and originating in the Guayana Shield, has been impounded by the construction of two dams. The largest, Guri, is 90 km upriver from the confluence with the Orinoco. The final stage of the dam and hydroelectric power plant