Demand shuffleβA method for multilevel p
β
A. Kimms
π
Article
π
1997
π
John Wiley and Sons
π
English
β 162 KB
This contribution acquaints the reader with a model for multilevel single-machine proportional lot sizing and scheduling problems (PLSPs) that appear in the scope of short-term production planning. It is one of the first articles that deals with dynamic capacitated multilevel lot sizing and scheduli