We develop polynomial algorithms for several cases of the NP-hard open shop scheduling problem of minimizing the number of late jobs by utilizing some recent results for the open shop makespan problem. For the two machine common due date problem, we assume that either the machines or the jobs are or
โฆ LIBER โฆ
Job-shop scheduling to minimize total waiting time
โ Scribed by Chu, Chengbin ;Portmann, Marie-Claude
- Publisher
- John Wiley and Sons
- Year
- 1993
- Tongue
- English
- Weight
- 538 KB
- Volume
- 9
- Category
- Article
- ISSN
- 8755-0024
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Open shop scheduling to minimize the num
โ
Christos Koulamas; George J. Kyparisis
๐
Article
๐
1998
๐
John Wiley and Sons
๐
English
โ 63 KB
๐ 2 views
Steady state waiting time in a multicent
โ
Asha S. Kapadia; Bartholomew P. Hsi
๐
Article
๐
1978
๐
John Wiley and Sons
๐
English
โ 280 KB
Scheduling deteriorating jobs to minimiz
โ
Wieslaw Kubiak; Steef van de Velde
๐
Article
๐
1998
๐
John Wiley and Sons
๐
English
โ 83 KB
We consider a single-machine problem of scheduling n independent jobs to minimize makespan, in which the processing time of job J j grows by w j with each time unit its start is delayed beyond a given common critical date d. This processing time is p j if J j starts by d. We show that this problem i
Flow-shop batch scheduling with identica
โ
Gur Mosheiov; Daniel Oron; Yaacov Ritov
๐
Article
๐
2004
๐
John Wiley and Sons
๐
English
โ 264 KB
Polynomial-time approximation scheme for
โ
T.C. Edwin Cheng; Qingqin Nong; Chi To Ng
๐
Article
๐
2011
๐
John Wiley and Sons
๐
English
โ 133 KB
๐ 1 views
Note: Open-shop scheduling with release
โ
Hans Kellerer; Thomas Tautenhahn; Gerhard Woeginger
๐
Article
๐
1995
๐
John Wiley and Sons
๐
English
โ 295 KB
๐ 2 views
We present the first polynomial-time algorithm for an open-shop problem with unit execution times, arbitrary release dates, and due dates. The objective is to minimize maximum lateness. 0 I995 John Wiley & Sons. Inc.