๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Job-shop scheduling to minimize total waiting time

โœ Scribed by Chu, Chengbin ;Portmann, Marie-Claude


Publisher
John Wiley and Sons
Year
1993
Tongue
English
Weight
538 KB
Volume
9
Category
Article
ISSN
8755-0024

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Open shop scheduling to minimize the num
โœ Christos Koulamas; George J. Kyparisis ๐Ÿ“‚ Article ๐Ÿ“… 1998 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 63 KB ๐Ÿ‘ 2 views

We develop polynomial algorithms for several cases of the NP-hard open shop scheduling problem of minimizing the number of late jobs by utilizing some recent results for the open shop makespan problem. For the two machine common due date problem, we assume that either the machines or the jobs are or

Scheduling deteriorating jobs to minimiz
โœ Wieslaw Kubiak; Steef van de Velde ๐Ÿ“‚ Article ๐Ÿ“… 1998 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 83 KB

We consider a single-machine problem of scheduling n independent jobs to minimize makespan, in which the processing time of job J j grows by w j with each time unit its start is delayed beyond a given common critical date d. This processing time is p j if J j starts by d. We show that this problem i

Note: Open-shop scheduling with release
โœ Hans Kellerer; Thomas Tautenhahn; Gerhard Woeginger ๐Ÿ“‚ Article ๐Ÿ“… 1995 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 295 KB ๐Ÿ‘ 2 views

We present the first polynomial-time algorithm for an open-shop problem with unit execution times, arbitrary release dates, and due dates. The objective is to minimize maximum lateness. 0 I995 John Wiley & Sons. Inc.