96/06097 Investigations of switching ope
π
Article
π
1996
π
Elsevier Science
β 205 KB
The paper develops the coordination of a load shedding scheme for a large integrated steelmaking cogeneration facility. A detailed description of each design procedure is given. The loads are tripped by the underfrequency relays to 8 revent the power system from collapsing when the plant beomes isol