IEC 61000-4-4:2012 relates to the immunity of electrical and electronic equipment to repetitive electrical fast transients. It has the status of a basic EMC publication in accordance with IEC Guide 107. It gives immunity requirements and test procedures related to electrical fast transients/bursts.
IEC 61000-4-5: Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test (IEC 61000-4-5:2014)
â Scribed by International Electrotechnical Commission
- Publisher
- International Electrotechnical Commission
- Year
- 2014
- Tongue
- English
- Leaves
- 160
- Edition
- 3.0
- Category
- Library
No coin nor oath required. For personal study only.
⊠Synopsis
IEC 61000-4-5:2014 relates to the immunity requirements, test methods, and range of recommended test levels for equipment with regard to unidirectional surges caused by over-voltages from switching and lightning transients. Several test levels are defined which relate to different environment and installation conditions. These requirements are developed for and are applicable to electrical and electronic equipment. The object of this standard is to establish a common reference for evaluating the immunity of electrical and electronic equipment when subjected to surges. The test method documented describes a consistent method to assess the immunity of an equipment or system against a defined phenomenon. This standard defines a range of:
- test levels;
- test equipment;
- test setups; and
- test procedures. The task of the described laboratory test is to find the reaction of the equipment under test (EUT) under specified operational conditions to surge voltages caused by switching and lightning effects. It is not intended to test the capability of the EUT's insulation to withstand high-voltage stress. Direct injections of lightning currents, i.e. direct lightning strikes, are not considered in this standard. This third edition cancels and replaces the second edition published in 2005, and constitutes a technical revision which includes the following significant technical changes with respect to the previous edition:
- a new Annex E on mathematical modelling of surge waveforms;
- a new Annex F on measurement uncertainty;
- a new Annex G on method of calibration of impulse measuring systems; and
- a new Annex H on coupling/decoupling surges to lines rated above 200 A. Moreover while surge test for ports connected to outside telecommunication lines was addressed in 6.2 of the second edition (IEC 61000-4-5:2005), in this third edition (IEC 61000-4-5:2014) the normative Annex A is fully dedicated to this topic. In particular it gives the specifications of the 10/700 ”s combined wave generator. Keywords: electromagnetic compatibility, EMC, TC77, SC77B
⊠Table of Contents
English
CONTENTS
FOREWORD
INTRODUCTION
1 Scope and object
2 Normative references
3 Terms, definitions and abbreviations
3.1 Terms and definitions
3.2 Abbreviations
4 General
4.1 Power system switching transients
4.2 Lightning transients
4.3 Simulation of the transients
5 Test levels
6 Test instrumentation
6.1 General
6.2 1,2/50 ÎŒs combination wave generator
6.2.1 General
6.2.2 Performance characteristics of the generator
6.2.3 Calibration of the generator
6.3 Coupling/decoupling networks
6.3.1 General
6.3.2 Coupling/decoupling networks for a.c./d.c. power port rated up to 200Â A per line
6.3.3 Coupling/decoupling networks for interconnection lines
6.4 Calibration of coupling/decoupling networks
6.4.1 General
6.4.2 Calibration of CDNs for a.c./d.c. power port rated up to 200Â A per line
6.4.3 Calibration of CDNs for interconnection lines
7 Test setup
7.1 Test equipment
7.2 Verification of the test instrumentation
7.3 Test setup for surges applied to EUT power ports
7.4 Test setup for surges applied to unshielded unsymmetrical interconnection lines
7.5 Test setup for surges applied to unshielded symmetrical interconnectionlines
7.6 Test setup for surges applied to shielded lines
8 Test procedure
8.1 General
8.2 Laboratory reference conditions
8.2.1 Climatic conditions
8.2.2 Electromagnetic conditions
8.3 Execution of the test
9 Evaluation of test results
10 Test report
Annex A (normative) Surge testing for unshielded outdoor symmetrical communicationlines intended to interconnect to widely dispersed systems
A.1 General
A.2 10/700 ÎŒs combination wave generator
A.2.1 Characteristics of the generator
A.2.2 Performances of the generator
A.2.3 Calibration of the generator
A.3 Coupling/decoupling networks
A.3.1 General
A.3.2 Coupling/decoupling networks for outdoor communication lines
A.4 Calibration of coupling/decoupling networks
A.5 Test setup for surges applied to outdoor unshielded symmetrical communication lines
Annex B (informative) Selection of generators and test levels
B.1 General
B.2 The classification of environments
B.3 The definition of port types
B.4 Generators and surge types
B.5 Tables
Annex C (informative) Explanatory notes
C.1 Different source impedance
C.2 Application of the tests
C.2.1 Equipment level immunity
C.2.2 System level immunity
C.3 Installation classification
C.4 Minimum immunity level of ports connected to the a.c./d.c. mains supply
C.5 Equipment level immunity of ports connected to interconnection lines
Annex D (informative) Considerations for achieving immunity for equipment connected to low voltage power distribution systems
Annex E (informative) Mathematical modelling of surge waveforms
E.1 General
E.2 Normalized time domain voltage surge (1,2/50 ÎŒs)
E.3 Normalized time domain current surge (8/20 ÎŒs)
E.4 Normalized time domain voltage surge (10/700 ÎŒs)
E.5 Normalized time domain current surge (5/320 ÎŒs)
Annex F (informative) Measurement uncertainty (MU) considerations
F.1 Legend
F.2 General
F.3 Uncertainty contributors to the surge measurement uncertainty
F.4 Uncertainty of surge calibration
F.4.1 General
F.4.2 Front time of the surge open-circuit voltage
F.4.3 Peak of the surge open-circuit voltage
F.4.4 Duration of the surge open-circuit voltage
F.4.5 Further MU contributions to time and amplitude measurements
F.4.6 Rise time distortion due to the limited bandwidth of the measuring system
F.4.7 Impulse peak and width distortion due to the limited bandwidth of the measuring system
F.5 Application of uncertainties in the surge generator compliance criterion
Annex G (informative) Method of calibration of impulse measuring systems
G.1 General
G.2 Estimation of measuring system response using the convolution integral
G.3 Impulse measuring system for open-circuit voltage (1,2/50 ÎŒs, 10/700 ÎŒs)
G.4 Impulse measuring system for short-circuit current (8/20 ÎŒs, 5/320 ÎŒs)
Annex H (informative) Coupling/decoupling surges to lines rated above 200 A
H.1 General
H.2 Considerations of coupling and decoupling
H.3 Additional precautions
Bibliography
Figures
Figure 1 â Simplified circuit diagram of the combination wave generator
Figure 2 â Waveform of open-circuit voltage (1,2/50 ÎŒs) at the output
of the generator with no CDN connected
Figure 3 â Waveform of short-circuit current (8/20 ÎŒs) at the output
of the generator with no CDN connected
Figure 4 â Selection of coupling/decoupling method
Figure 5 â Example of coupling network and decoupling networkfor capacitive coupling on a.c./d.c. lines line-to-line coupling
Figure 6 â Example of coupling network and decoupling networkfor capacitive coupling on a.c./d.c. lines: line-to-ground coupling
Figure 7 â Example of coupling network and decoupling network for capacitive coupling on a.c. lines (3 phases): line L2-to-line L3 coupling
Figure 8 â Example of coupling network and decoupling network for capacitive coupling on a.c. lines (3 phases): line L3-to-ground coupling
Figure 9 â Example of coupling network and decoupling network for unshielded unsymmetrical interconnection lines: line-to-line and line-to-ground coupling
Figure 10 â Example of coupling and decoupling network for unshielded symmetrical interconnection lines: lines-to-ground coupling
Figure 11 â Example of coupling and decoupling network for unshielded symmetrical interconnection lines: lines-to-ground coupling via capacitors
Figure 12 â Example of test setup for surges applied to shielded lines
Figure A.1 â Simplified circuit diagram of the combination wave generator
(10/700 ÎŒs â 5/320 ÎŒs)
Figure A.2 â Waveform of open-circuit voltage (10/700 ÎŒs)
Figure A.3 â Waveform of the 5/320 ÎŒs short-circuit current waveform
Figure A.4 â Example of test setup for unshielded outdoor symmetrical communication lines: lines-to-ground coupling, coupling via gas arrestors (primary protection fitted)
Figure E.1 â Voltage surge (1,2/50 ÎŒs): width time response Tw
Figure E.2 â Voltage surge (1,2/50 ÎŒs): rise time response T
Figure E.3 â Voltage surge (1,2/50 ÎŒs): spectral response with Îf = 3,333 kHz
Figure E.4 â Current surge (8/20 ÎŒs): width time response Tw
Figure E.5 â Current surge (8/20 ÎŒs): rise time response Tr
Figure E.6 â Current surge (8/20 ÎŒs): spectral response with Îf = 10 kHz
Figure E.7 â Voltage surge (10/700 ÎŒs): width time response Tw
Figure E.8 â Voltage surge (10/700 ÎŒs): rise time response T
Figure E.9 â Voltage surge (10/700 ÎŒs): spectral response with Îf = 0,2 kHz
Figure E.10 â Current surge (5/320 ÎŒs): width time response Tw
Figure E.11 â Current surge (5/320 ÎŒs): rise time response Tr
Figure E.12 â Current surge (5/320 ÎŒs): spectral response with Îf = 0,4 kHz
Figure G.1 â Simplified circuit diagram of the current step generator
Tables
Table 1 â Test levels
Table 2 â Definitions of the waveform parameters 1,2/50 ÎŒs and 8/20 ÎŒs
Table 3 â Relationship between peak open-circuit voltage and peak short-circuit current
Table 4 â Voltage waveform specificationat the EUT port of the CDN
Table 5 â Current waveform specification at the EUT port of the CDN
Table 6 â Relationship between peak open-circuit voltageand peak short-circuit current at the EUT port of the CDN
Table 7 â Summary of calibration process for CDNsfor unsymmetrical interconnection lines
Table 8 â Surge waveform specifications at the EUT port of the CDNfor unsymmetrical interconnection lines
Table 9 â Summary of calibration process for CDNsfor symmetrical interconnection lines
Table 10 â Surge waveform specifications at the EUT portof the CDN for symmetrical interconnection lines
Table A.1 â Definitions of the waveform parameters 10/700 ÎŒs and 5/320 ÎŒs
Table A.2 â Relationship between peak open-circuit voltageand peak short-circuit current
Table A.3 â Summary of calibration process for CDNs for unshielded outdoor symmetrical communication lines
Table A.4 â Surge waveform specifications at the EUT port of the CDN for unshielded outdoor symmetrical communication lines
Table B.1 â Power ports: selection of the test levels (depending on the installation class)
Table B.2 â Circuits/lines: selection of the test levels(depending on the installation class)
Table F.1 â Example of uncertainty budget for surge open-circuit voltage front time (TfV)
Table F.2 â Example of uncertainty budget for surge open-circuit voltage peak value (VP)
Table F.3 â Example of uncertainty budget for surge open-circuit voltage duration (Td)
Table F.4 â α factor, Equation (F.5), of different unidirectional impulse responses corresponding to the same bandwidth of the system B
Table F.5 â ÎČ factor, Equation (F.9), of the standard surge waveforms
Table H.1 â Recommended inductance values for decoupling lines (> 200 A)
Français
SOMMAIRE
AVANT-PROPOS
INTRODUCTION
1 Domaine d'application et objet
2 Références normatives
3 Termes, définitions et abréviations
3.1 Termes et définitions
3.2 Abréviations
4 Généralités
4.1 Transitoires de manĆuvre sur les rĂ©seaux Ă©lectriques
4.2 Transitoires de foudre
4.3 Simulation des transitoires
5 Niveaux d'essai
6 Instrumentation d'essai
6.1 Généralités
6.2 GĂ©nĂ©rateur dâondes combinĂ©es 1,2/50 ÎŒs
6.2.1 Généralités
6.2.2 Caractéristiques de performance du générateur
6.2.3 Etalonnage du générateur
6.3 Réseaux de couplage/découplage
6.3.1 Généralités
6.3.2 RĂ©seaux de couplage/dĂ©couplage pour accĂšs d'alimentation en c.a./c.c. de valeur assignĂ©e jusquâĂ 200 A par ligne
6.3.3 Réseaux de couplage/découplage pour lignes d'interconnexion
6.4 Etalonnage des réseaux de couplage/découplage
6.4.1 Généralités
6.4.2 Etalonnage de RCD pour accĂšs dâalimentation c.a./c.c. de valeur assignĂ©e jusquâĂ 200 A par ligne
6.4.3 Etalonnage des RCD pour les lignes dâinterconnexion
7 Montage d'essai
7.1 Matériel d'essai
7.2 VĂ©rification des instruments dâessai
7.3 Montage d'essai pour les ondes de choc appliquĂ©es aux accĂšs dâalimentation de lâEUT
7.4 Montage d'essai pour les ondes de choc appliquées aux lignes d'interconnexion non blindées et non symétriques
7.5 Montage d'essai pour les ondes de choc appliquées aux lignes d'interconnexion non blindées et symétriques
7.6 Montage dâessai pour les ondes de choc appliquĂ©es aux lignes blindĂ©es
8 ProcĂ©dure dâessai
8.1 Généralités
8.2 Conditions de référence en laboratoire
8.2.1 Conditions climatiques
8.2.2 Conditions électromagnétiques
8.3 RĂ©alisation de lâessai
9 Evaluation des rĂ©sultats dâessai
10 Rapport dâessai
Annexe A (normative) Essai dâonde de choc pour lignes de communicationsnon blindĂ©es symĂ©triques extĂ©rieures, destinĂ©es Ă interconnecterdes systĂšmes largement dispersĂ©s
A.1 Généralités
A.2 GĂ©nĂ©rateur dâondes combinĂ©es 10/700 ÎŒs
A.2.1 Caractéristiques du générateur
A.2.2 Performances du générateur
A.2.3 Etalonnage du générateur
A.3 Réseaux de couplage/découplage
A.3.1 Généralités
A.3.2 Réseaux de couplage/découplage pour les lignes de communications extérieures
A.4 Etalonnage des réseaux de couplage/découplage
A.5 Montage dâessai pour les ondes de choc appliquĂ©es aux lignes de communications non blindĂ©es symĂ©triques extĂ©rieures
Annexe B (informative) Choix des générateurs et des niveaux d'essai
B.1 Généralités
B.2 Classification des environnements
B.3 DĂ©finition des types dâaccĂšs
B.4 Types de gĂ©nĂ©rateurs et dâondes de choc
B.5 Tableaux
Annexe C (informative) Notes explicatives
C.1 Différentes impédances de source
C.2 Application des essais
C.2.1 Niveau d'immunité d'un matériel
C.2.2 Niveau d'immunité d'un systÚme
C.3 Classification de l'installation
C.4 Niveau d'immunitĂ© minimum des accĂšs raccordĂ©s Ă lâalimentation secteur c.a./c.c.
C.5 Niveau d'immunité d'un matériel dont les accÚs sont raccordés à des lignes d'interconnexion
Annexe D (informative) Considérations en vue d'obtenir l'immunité pour les matériels connectés aux réseaux de distribution d'alimentation basse tension
Annexe E (informative) ModĂ©lisation mathĂ©matique des formes dâondes de choc
E.1 Généralités
E.2 Tension dâonde de choc normalisĂ©e dans le domaine temporel (1,2/50 ÎŒs)
E.3 Courant dâonde de choc normalisĂ© dans le domaine temporel (8/20 ÎŒs)
E.4 Tension de choc normalisĂ©e dans le domaine temporel (10/700 ÎŒs)
E.5 Courant de choc normalisĂ© dans le domaine temporel (5/320 ÎŒs)
Annexe F (informative) ConsidĂ©rations relatives Ă lâincertitude de mesure (MU)
F.1 Légende
F.2 Généralités
F.3 Contributeurs Ă lâincertitude de mesure de lâonde de choc
F.4 Incertitude de lâĂ©talonnage de lâonde de choc
F.4.1 Généralités
F.4.2 Durée du front de la tension de choc en circuit ouvert
F.4.3 CrĂȘte de tension de choc en circuit ouvert
F.4.4 Durée de la tension de choc en circuit ouvert
F.4.5 Autres contributeurs Ă lâincertitude de mesure pour les mesures de temps et dâamplitude
F.4.6 Distorsion du temps de montée en raison de la largeur de bande limitée du systÚme de mesure
F.4.7 CrĂȘte dâimpulsion et distorsion de largeur du fait de la largeur de bande limitĂ©e du systĂšme de mesure
F.5 Application des incertitudes au critĂšre de conformitĂ© du gĂ©nĂ©rateur dâondes de choc
Annexe G (informative) MĂ©thode dâĂ©talonnage des systĂšmes de mesure dâimpulsion
G.1 Généralités
G.2 Estimation de la rĂ©ponse du systĂšme de mesure utilisant lâintĂ©grale de convolution
G.3 SystĂšme de mesure dâimpulsion pour une tension en circuit ouvert (1,2/50
ÎŒs, 10/700 ÎŒs)
G.4 SystĂšme de mesure dâimpulsion pour le courant de court-circuit (8/20 ÎŒs,
5/320 ÎŒs)
Annexe H (informative) Ondes de choc de couplage/découplage appliquées à des lignes de valeurs assignées supérieures à 200 A
H.1 Généralités
H.2 Considérations en matiÚre de couplage et découplage
H.3 Précautions supplémentaires
Bibliographie
Figures
Figure 1 â SchĂ©ma de principe simplifiĂ© du circuit du gĂ©nĂ©rateur dâondes combinĂ©es
Figure 2 â Forme d'onde de tension en circuit ouvert (1,2/50 ÎŒs)
en sortie du générateur sans RCD connecté
Figure 3 â Forme d'onde du courant de court-circuit (8/20 ÎŒs)
en sortie du générateur sans RCD connecté
Figure 4 â SĂ©lection dâune mĂ©thode de couplage/dĂ©couplage
Figure 5 â Exemple de rĂ©seau de couplage et de rĂ©seau de dĂ©couplage pour couplage capacitif sur lignes c.a./c.c.: couplage entre phases
Figure 6 â Exemple de rĂ©seau de couplage et de rĂ©seau de dĂ©couplage pour couplage capacitif sur lignes c.a./c.c.: couplage phase-terre
Figure 7 â Exemple de rĂ©seau de couplage et de rĂ©seau de dĂ©couplage pour couplage capacitif sur lignes c.a. (triphasĂ©): couplage entre la phase L2 et la phase L3
Figure 8 â Exemple de rĂ©seau de couplage et de rĂ©seau de dĂ©couplage pour couplage capacitif sur lignes c.a. (triphasĂ©): couplage entre la phase L3 et la terre
Figure 9 â Exemple de rĂ©seau de couplage et de rĂ©seau de dĂ©couplagepour les lignes dâinterconnexion non blindĂ©es et non symĂ©triques:couplage entre phases et phase-terre
Figure 10 â Exemple de rĂ©seau de couplage et de dĂ©couplage pour les lignes dâinterconnexion non blindĂ©es symĂ©triques; couplage phases-terre
Figure 11 â Exemple de rĂ©seau de couplage et de dĂ©couplage pour les lignes dâinterconnexion non blindĂ©es symĂ©triques: couplage phases-terre par condensateurs
Figure 12 â Exemple de montage d'essai pour les ondes de chocappliquĂ©es aux lignes blindĂ©es
Figure A.1 â SchĂ©ma de principe simplifiĂ© du circuit du gĂ©nĂ©rateur
dâondes combinĂ©es (10/700 ÎŒs â 5/320 ÎŒs)
Figure A.2 â Forme dâonde de tension en circuit ouvert (10/700 ÎŒs)
Figure A.3 â Forme dâonde de courant de court-circuit 5/320 ÎŒs
Figure A.4 â Exemple de montage d'essai pour lignes de communications non blindĂ©es symĂ©triques extĂ©rieures: couplage phases-terre, couplage par parafoudres Ă gaz (Ă©quipĂ©s de protection primaire)
Figure E.1 â Tension de choc (1,2/50 ÎŒs): rĂ©ponse dans lâintervalle de temps Tw
Figure E.2 â Tension de choc (1,2/50 ÎŒs): rĂ©ponse de temps de montĂ©e T
Figure E.3 â Tension de choc (1,2/50 ÎŒs): rĂ©ponse spectrale, Îf = 3,333 kHz
Figure E.4 â Courant de choc (8/20 ÎŒs): rĂ©ponse dans lâintervalle de temps Tw
Figure E.5 â Courant de choc (8/20 ÎŒs): rĂ©ponse de temps de montĂ©e Tr
Figure E.6 â Courant de choc (8/20 ÎŒs): rĂ©ponse spectrale, Îf = 10 kHz
Figure E.7 â Tension de choc (10/700 ÎŒs): rĂ©ponse dans lâintervalle de temps Tw
Figure E.8 â Tension de choc (10/700 ÎŒs): rĂ©ponse de temps de montĂ©e T
Figure E.9 â Tension de choc (10/700 ÎŒs): rĂ©ponse spectrale, Îf = 0,2 kHz
Figure E.10 â Courant de choc (5/320 ÎŒs): rĂ©ponse dans lâintervalle de temps Tw
Figure E.11 â Courant de choc (5/320 ÎŒs): rĂ©ponse de temps de montĂ©e Tr
Figure E.12 â Courant de choc (5/320 ÎŒs): rĂ©ponse spectrale, Îf = 0,4 kHz
Figure G.1 â SchĂ©ma de principe simplifiĂ© du circuitdu gĂ©nĂ©rateur dâĂ©chelon de courant
Tableaux
Tableau 1 â Niveaux d'essai
Tableau 2 â DĂ©finitions des paramĂštres des formes d'ondes 1,2/50 ÎŒs et 8/20 ÎŒs
Tableau 3 â Relations entre tension de crĂȘte en circuit ouvert et courant de crĂȘte de court-circuit
Tableau 4 â SpĂ©cification de la forme dâonde de la tension Ă lâaccĂšs EUT du RCD
Tableau 5 â SpĂ©cification de la forme d'onde du courant Ă lâaccĂšs EUT du RCD
Tableau 6 â Relation entre la tension de crĂȘte en circuit ouvert et le courantde crĂȘte de court-circuit Ă lâaccĂšs EUT du RCD
Tableau 7 â RĂ©sumĂ© du processus dâĂ©talonnage des RCD pour les lignes dâinterconnexion non symĂ©triques
Tableau 8 â SpĂ©cifications de la forme dâonde de choc Ă lâaccĂšs EUT du RCD pour les lignes dâinterconnexion non symĂ©triques
Tableau 9 â RĂ©sumĂ© du processus dâĂ©talonnage des RCD pour les lignes dâinterconnexion symĂ©triques
Tableau 10 â SpĂ©cifications de la forme dâonde de choc Ă lâaccĂšs EUTdu RCD pour les lignes dâinterconnexion symĂ©triques
Tableau A.1 â DĂ©finitions des paramĂštres des formes dâonde 10/700 ÎŒs et 5/320 ÎŒs
Tableau A.2 â Relations entre tension de crĂȘte en circuit ouvert et courant de crĂȘte de court-circuit
Tableau A.3 â RĂ©sumĂ© du processus dâĂ©talonnage des RCD pour les lignes de communications non blindĂ©es symĂ©triques extĂ©rieures
Tableau A.4 â SpĂ©cifications de la forme dâonde de choc Ă lâaccĂšs EUT du RCD pour les lignes de communications non blindĂ©es symĂ©triques extĂ©rieures
Tableau B.1 â AccĂšs dâalimentation: choix des niveaux dâessai (en fonction de la classe de lâinstallation)
Tableau B.2 â Circuits/lignes: choix des niveaux dâessai (en fonction de la classe de lâinstallation)
Tableau F.1 â Exemple de budget dâincertitude pour la durĂ©e du front de la tension de choc en circuit ouvert (TfV)
Tableau F.2 â Exemple de budget dâincertitude pour la valeur de crĂȘte de la tension de choc en circuit ouvert (VP)
Tableau F.3 â Exemple de budget dâincertitude pour la durĂ©e de la tension de choc en circuit ouvert (Td)
Tableau F.4 â Facteur α, Equation (F.5), de diffĂ©rentes rĂ©ponses impulsionnelles unidirectionnelles correspondant Ă la mĂȘme largeur de bande du systĂšme B
Tableau F.5 â Facteur ÎČ, Equation (F.9), des formes dâondes de choc normalisĂ©es
Tableau H.1 â Valeurs dâinductance recommandĂ©espour les lignes de dĂ©couplage (> 200 A)
đ SIMILAR VOLUMES
IEC 61000-4-2:2008 relates to the immunity requirements and test methods for electrical and electronic equipment subjected to static electricity discharges, from operators directly, and from personnel to adjacent objects. It additionally defines ranges of test levels which relate to different enviro
IEC 61000-4-3:2006+A1:2007+A2:2010 is applicable to the immunity requirements of electrical and electronic equipment to radiated electromagnetic energy. It establishes test levels and the required test procedures. The object of this standard is to establish a common reference for evaluating the immu