A new heuristic method is presented for the resolution of multiresource constrained conflicts in project scheduling. In attempting to find a minimal makespan solution, the algorithm employs a simple procedure to generate a feasible solution with no backtracking. A postanalysis phase then applies a h
โฆ LIBER โฆ
Identifying the critical sequence in a resource constrained project
โ Scribed by Bruce M. Woodworth; Sean Shanahan
- Publisher
- Elsevier Science
- Year
- 1988
- Tongue
- English
- Weight
- 928 KB
- Volume
- 6
- Category
- Article
- ISSN
- 0263-7863
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
A new heuristic solution method in resou
โ
Colin E. Bell; Jaemin Han
๐
Article
๐
1991
๐
John Wiley and Sons
๐
English
โ 979 KB
Multi-mode resource-constrained project
โ
Arno Sprecher; Andreas Drexl
๐
Article
๐
1998
๐
Elsevier Science
๐
English
โ 199 KB
A constraint programming approach for th
โ
Olivier Liess; Philippe Michelon
๐
Article
๐
2007
๐
Springer US
๐
English
โ 553 KB
The multiple resource constrained projec
โ
Terence Nazareth; Sanjay Verma; Subir Bhattacharya; Amitava Bagchi
๐
Article
๐
1999
๐
Elsevier Science
๐
English
โ 404 KB
We describe a simple breadth-ยฎrst tree search scheme for minimizing the makespan of a project consisting of a partially ordered network of activities under multiple resource constraints. The method compares quite favourably with existing techniques that employ depth-ยฎrst or best-ยฎrst search; in part
A decision support system for the resour
โ
E. Nowicki; C. Smutnicki
๐
Article
๐
1994
๐
Elsevier Science
๐
English
โ 839 KB
A simple method for estimating the durat
โ
Harold M. Hall; Gerald W. Evans
๐
Article
๐
1987
๐
Elsevier Science
๐
English
โ 532 KB