This paper presents an asymptotic analysis of stochastic manufacturing systems consisting of machines in tandem subject to breakdown and repair and facing a constant demand, as the rates of change of the machine states approach infinity. This situation gives rise to a limiting problem in which the s
Hierarchical Production Control in a Stochastic Manufacturing System with Long-Run Average Cost
โ Scribed by Suresh P Sethi; Hanqin Zhang; Qing Zhang
- Publisher
- Elsevier Science
- Year
- 1997
- Tongue
- English
- Weight
- 275 KB
- Volume
- 214
- Category
- Article
- ISSN
- 0022-247X
No coin nor oath required. For personal study only.
โฆ Synopsis
This paper presents an asymptotic analysis of a stochastic manufacturing system consisting of parallel machines subject to breakdown and repair and facing a constant demand, as the rates of change of the machine states approach infinity. This situation gives rise to a limiting problem in which the stochastic machine availability is replaced by its equilibrium mean availability. The long-run average cost for the original problem converges to the long-run average cost of the limiting problem. Open-loop and feedback controls for the original problem are constructed from optimal controls of the limiting problem in a way that guarantees their asymptotic optimality. The convergence rate of the long-run average cost for the original problem to that of the limiting problem is established. This helps in providing an error estimate for the constructed open-loop asymptotic optimal control.
๐ SIMILAR VOLUMES