𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Growth schedule ofXanthium canadense: Does it optimize the timing of reproduction?

✍ Scribed by H. Sugiyama; T. Hirose


Book ID
104724007
Publisher
Springer-Verlag
Year
1991
Tongue
English
Weight
637 KB
Volume
88
Category
Article
ISSN
0029-8549

No coin nor oath required. For personal study only.

✦ Synopsis


The effects of nutrition on the timing of reproductive initiation of a short-day annual plant Xanthium canadense (cocklebur) were examined with the following hypotheses in mind: If the plant always follows an optimal growth schedule, low-nutrient plants will initiate reproductive growth earlier than high-nutrient plants. On the other hand, if the plant flowers in response to photoperiodic stimuli, both plants will initiate reproductive growth on the same day. The sand-culture experiment showed that high-nutrient plants flowered earlier than the low-nutrient plants, leading to rejection of the first hypothesis. The predicted optimal flowering time is 2 days later than the actual flowering time in high-nutrient plants and 10 days earlier in low-nutrient plants. These deviations from the optimal times reduced the reproductive yield by 0.1% and 2.3%, respectively. The ratio of the final reproductive yield to the vegetative mass at flower initiation was 1.10 in high-nutrient plants and 0.63 in low-nutrient plants. Since the expected ratio for the optimal growth schedule is 1.0, high-nutrient plants followed the opitmal growth schedule more closely than the low-nutrient plants. Cocklebur is a fast-growing annual which is common in relatively nutrient-rich environments. This study suggests that cocklebur adapts itself to such environments through its photoperiodic response.


📜 SIMILAR VOLUMES


[Springer Optimization and Its Applicati
✍ Ríos-Mercado, Roger Z.; Ríos-Solís, Yasmín A. 📂 Article 📅 2011 🏛 Springer New York 🌐 English ⚖ 302 KB

Whether different types of costs are to be reduced, benefits to be maximized or scarce resources to be managed, scheduling theory provides intelligent methods for practitioners and scientists. The just-in-time (JIT) production philosophy has enriched the classical scheduling theory with models that