Flowshop scheduling with dominant machines
โ Scribed by Johnny C. Ho; Jatinder N.D. Gupta
- Book ID
- 107950963
- Publisher
- Elsevier Science
- Year
- 1995
- Tongue
- English
- Weight
- 620 KB
- Volume
- 22
- Category
- Article
- ISSN
- 0305-0548
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
This paper attempts to solve a two-machine ยฏowshop bicriteria scheduling problem with release dates for the jobs, in which the objective function is to minimize a weighed sum of total ยฏow time and makespan. To tackle this scheduling problem, an integer programming model with N 2 +3N variables and 5N
The majority of the scheduling literature carries a common assumption that machines are available all the time. However, this availability assumption may not be true in real industry settings, since a machine may become unavailable during certain periods of time when, for instance, a machine breakdo
This paper considers a two-stage flexible flowshop scheduling problem with no waiting time between two sequential operations of a job and no idle time between two consecutive processed jobs on machines of the second stage. We show its complexity and present a heuristic algorithm with asymptotically