๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Flow shop scheduling with multiple objective of minimizing makespan and total flow time

โœ Scribed by D. Ravindran; S.J. Selvakumar; R. Sivaraman; A. Noorul Haq


Publisher
Springer
Year
2004
Tongue
English
Weight
390 KB
Volume
25
Category
Article
ISSN
0268-3768

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Flow shop scheduling with multiple opera
โœ J. Riezebos; G. J. C. Gaalman; J. N. D. Gupta ๐Ÿ“‚ Article ๐Ÿ“… 1995 ๐Ÿ› Springer US ๐ŸŒ English โš– 996 KB

A scheduling system is proposed and developed for a special type of flow shop. In this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j -1 has finishe