𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Fine synchronization of the CMS muon drift tubes local trigger

✍ Scribed by M. Aldaya; N. Amapane; C. Battilana; M. Bellato; A. Benvenuti; D. Bonacorsi; M. Bontenackels; P. Capiluppi; L. Castellani; F.R. Cavallo; G. Cerminara; M. Cerrada; P. Checchia; E. Conti; B. de la Cruz; F. Dal Corso; G.M. Dallavalle; C. Fernandez; J. Fernández de Trocóniz; M.C. Fouz; F. Gasparini; U. Gasparini; P. Giacomelli; M. Giunta; F. Gonella; L. Guiducci; T. Hebbeker; K. Hoepfner; I. Jimenez; I. Josa; S. Lacaprara; I. Lippi; S. Marcellini; G. Maron; G. Masetti; A.T. Meneguzzo; V. Monaco; A. Montanari; F. Navarria; F. Odorici; A. Parenti; M. Passaseo; M. Pegoraro; A. Perrotta; J. Puerta; H. Reithler; L. Romero; P. Ronchese; A. Rossi; T. Rovelli; P. Ruetten; M. Sowa; A. Staiano; N. Toniolo; E. Torassa; G. Torromeo; R. Travaglini; S. Vanini; S. Ventura; C. Villanueva; C. Willmott; M. Zanetti; P. Zotto; G. Zumerle


Publisher
Elsevier Science
Year
2006
Tongue
English
Weight
216 KB
Volume
564
Category
Article
ISSN
0168-9002

No coin nor oath required. For personal study only.


📜 SIMILAR VOLUMES


Results of the first integration test of
✍ M. Aldaya; N. Amapane; S. Argirò; C. Battilana; R. Bellan; M. Bellato; A. Benven 📂 Article 📅 2007 🏛 Elsevier Science 🌐 English ⚖ 581 KB

Two drift tubes (DTs) chambers of the CMS muon barrel system were exposed to a 40 MHz bunched muon beam at the CERN SPS, and for the first time the whole CMS Level-1 DTs-based trigger system chain was tested. Data at different energies and inclination angles of the incident muon beam were collected,

Test beam analysis of the first CMS drif
✍ C. Albajar; N. Amapane; P. Arce; C. Autermann; M. Bellato; M. Benettoni; A. Benv 📂 Article 📅 2004 🏛 Elsevier Science 🌐 English ⚖ 641 KB

In October 2001 the first produced CMS Barrel Drift Tube (DT) Muon Chamber was tested at the CERN Gamma Irradiation Facility (GIF) using a muon beam. A Resistive Plate Chamber (RPC) was attached to the top of the DT chamber, and, for the first time, both detectors were operated coupled together. The