Estimating the Timing of the Economical Replacement of Water Mains Based on the Predicted Pipe Break Times Using the Proportional Hazards Models
β Scribed by Suwan Park
- Publisher
- Springer Netherlands
- Year
- 2011
- Tongue
- English
- Weight
- 375 KB
- Volume
- 25
- Category
- Article
- ISSN
- 0920-4741
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
## Abstract A twoβdimensional model representing flow and nitrate transport in groundwater was developed and applied to a hillslope of the Kervidy catchment. The objective of the modelling was: (1) to characterize better the flow and nitrate transport in the groundwater and to determine the charact
Most of the usual studies on a sound insulation system were introduced from the deterministic viewpoint in the frequency domain. This paper presents for the first time a fairly simplified identification method applicable to the actual situation of a sound insulation system under the introduction of