𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Erratum to: “Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan” [Int. J. Prod. Econ. 112 (2008) 161–167]

✍ Scribed by Gara-Ali, Ahmed; Espinouse, Marie-Laure


Book ID
121844435
Publisher
Elsevier Science
Year
2014
Tongue
English
Weight
252 KB
Volume
153
Category
Article
ISSN
0925-5273

No coin nor oath required. For personal study only.