W รคrtsilรค has opened an extension to the production plant in Wuxi, China that manufactures seals, bearings and thruster units. Investment in the factory has totalled 20.8M during [2005][2006][2007]. With this investment, the company aims to be more able to meet the fast growing demand in China, to
ERIKS UK continues to expand
- Book ID
- 104380612
- Publisher
- Elsevier Science
- Year
- 2008
- Tongue
- English
- Weight
- 60 KB
- Volume
- 2008
- Category
- Article
- ISSN
- 1350-4789
No coin nor oath required. For personal study only.
โฆ Synopsis
Sealing Technology 5 from seal erosion and compression set caused seal issues in IMD and STI processes. The scheduled maintenance cycle was 90 days but premature sealing issues occurred within 30-60 days. The incumbent O-ring performance issues were related to mechanical as well as chemical attack with plasma erosion. By using Kalrez 9100 parts the 30-day planned maintenance period has been extended to 180 days, depending on seal location. Increased equipment availability has increased production capacity by more than 20%.
๐ SIMILAR VOLUMES
for extra bond strength. Applications include insulation panels in buildings and vehicles, cladding and architectural panels and textile and foam laminates.