Cell and battery test methods
β
I.W. Jones
π
Article
π
1986
π
Elsevier Science
π
English
β 27 KB
Following the capacity test the battery is recharged according to the above procedure and then discharged with a constant current at a two hour rate to check that the operation is satisfactory. Finally a cooling system load test is carried out by discharging the battery with cu. 80% of the max. batt